Incident Library
Mixer bowl ignition during scraping
CriticalPropellant mixing
Illustrative case: propellant ignited while an operator manually scraped a mixer bowl; flash fire injured operator.
Root cause: Non-conductive tool, ESD build-up, procedure allowed scraping with energized mixer interlocks bypassed.
Lessons: Remote operations, conductive tools, interlock integrity checks, operator shielding.
Dust collector deflagration
HighDust collection
Illustrative case: accumulated nitrocellulose fines ignited in a dry dust collector.
Root cause: Inadequate housekeeping and no explosion venting/isolation.
Lessons: Wet collectors for energetics, NFPA 660 DHA, isolation valves, cleaning frequency.
Lightning strike near magazine
HighEnergetic storage
Illustrative case: lightning struck an earth-covered magazine with an incomplete LPS; no detonation but damage to headwall.
Root cause: Air terminal bonding not inspected after repairs.
Lessons: Periodic LPS inspection per NFPA 780 / DESR, bonding verification after any modification.
SIS bypass left active
HighProcess control
Illustrative case: SIS trip bypass left active after maintenance; overtemperature in curing oven not tripped.
Root cause: Weak bypass management and alarm handling.
Lessons: Bypass authorization, time-limited bypasses, IEC 61511 management of change.
OB/OD kick-out beyond boundary
MediumOpen burn / open detonation
Illustrative case: fragments from open detonation landed beyond the planned exclusion zone.
Root cause: Charge size exceeded permit assumptions; wind not checked.
Lessons: Enforce permit limits, fragment distance calc, weather go/no-go criteria.
Solvent vapor flash fire
HighSolvent recovery
Illustrative case: solvent vapor released during filter change ignited by non-rated portable lamp.
Root cause: Temporary equipment not matched to zone classification.
Lessons: Zone-rated portable equipment control, hot work permits, gas testing.
Deluge failed to activate
CriticalFire protection
Illustrative case: UV/IR detection activated but deluge valve did not open due to closed isolation valve.
Root cause: Valve supervision alarm ignored; ITM overdue.
Lessons: Valve supervision, NFPA 25 ITM, response time testing.
Unauthorized network access to PLC
MediumControl systems
Illustrative case: vendor remote-access path allowed unauthorized change to PLC logic.
Root cause: Flat network, shared credentials.
Lessons: IEC 62443 zones and conduits, MFA, change detection.