← Standards
DoD · DDESB · US
DESR 6055.09
DoD Explosives Safety Regulation (Volumes 1–8)
Quantity-distance, hazard classification, site plans and explosives facility design criteria.
Current edition: 2019 (Ch. 2023)Official source ↗
Applies to Features of Work (44)
- Propellant MixingCritical
- Propellant Mixing – Building 100High
- Propellant Mixing – Building 200Critical
- Propellant Mixing – Line ACritical
- Propellant ExtrusionCritical
- Propellant Extrusion – Building 100Critical
- Propellant Extrusion – Building 200Low
- Propellant Extrusion – Line ACritical
- Propellant CastingCritical
- Propellant Casting – Building 100Critical
- Propellant Casting – Building 200Critical
- Propellant Casting – Line AHigh
- Propellant CuringCritical
- Propellant Curing – Building 100Critical
- Propellant Curing – Building 200Critical
- Propellant Curing – Line ACritical
- Base Bleed AssemblyMedium
- Base Bleed Assembly – Building 100Critical
- Base Bleed Assembly – Building 200Critical
- Base Bleed Assembly – Line ACritical
- Nitrocellulose HandlingCritical
- Nitrocellulose Handling – Building 100Critical
- Nitrocellulose Handling – Building 200Critical
- Nitrocellulose Handling – Line ACritical
- Solvent RecoveryCritical
- Solvent Recovery – Building 100Critical
- Solvent Recovery – Building 200Medium
- Solvent Recovery – Line ACritical
- Energetic Material StorageCritical
- Energetic Material Storage – Building 100Critical
- Energetic Material Storage – Building 200Critical
- Energetic Material Storage – Line ACritical
- Open Burn / Open DetonationMedium
- Open Burn / Open Detonation – Building 100Medium
- Open Burn / Open Detonation – Building 200Medium
- Open Burn / Open Detonation – Line AMedium
- Charge Assembly & Bag LoadinggovernsCritical
- Igniter & Primer Pad AssemblygovernsCritical
- Base Bleed Grain Pressing & InhibitingHigh
- Packing, Palletizing & Inert Shipping DockgovernsMedium
- Static Control & Facility GroundingHigh
- Barricades & Earth-Covered MagazinesgovernsHigh
- Site Civil, Roads & Explosives Truck RoutinggovernsMedium
- Personnel Facilities & IBD SeparationgovernsMedium
Required for Equipment (0)
- No equipment mapping.
Crosswalk
DESR 6055.09↔UK ER 2014Explosives separation distancesSignificant Difference
DESR 6055.09↔SprengGExplosives licensing and storagePartial
DESR 6055.09↔2. SprengVStorage separation distancesPartial