DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Controls · Compliance Report

Safety PLC (SIS)

Safety PLC (SIS) used in energetics production and support facilities.

Most Restrictive Requirement
UFC 4-010-06
Cybersecurity of Facility-Related Control Systems

Required Certifications

  • UL 508A
  • IEC 61511 SIL Certificate
  • DoD RMF ATO

Typically Missing at Submittal

  • DoD RMF ATO
  • NRTL Listing

Known Issues

  • Missing FM approval for explosion vent
  • Static dissipative materials not validated for energetic dust

Required Standards (4)

  • UFCUFC 4-010-06Cybersecurity of Facility-Related Control Systems
  • IECIEC 61511Functional Safety - SIS for the Process Industry
  • UFGSUFGS 23 09 23Direct Digital Control for HVAC
  • IECIEC 62061Safety of Machinery - Functional Safety

Approval Authorities

  • USACE
    Construction Agent / Design Review
  • Fire Protection Engineer
    Qualified Fire Protection Engineer
  • Pressure Equipment Inspector
    National Board Commissioned Inspector

Used in Features of Work