DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Pressure Equipment · Compliance Report

Pressure Relief Valve

Pressure Relief Valve used in energetics production and support facilities.

Most Restrictive Requirement
2014/68/EU
Pressure Equipment Directive

Required Certifications

  • ASME U-Stamp
  • National Board Registration
  • CE / PED Module

Typically Missing at Submittal

  • CE / PED Module
  • NRTL Listing

Known Issues

  • Missing FM approval for explosion vent
  • Static dissipative materials not validated for energetic dust

Required Standards (2)

  • PED2014/68/EUPressure Equipment Directive
  • PEDEN ISO 4126Safety Devices for Protection Against Excessive Pressure

Approval Authorities

  • USACE
    Construction Agent / Design Review
  • Fire Protection Engineer
    Qualified Fire Protection Engineer
  • Pressure Equipment Inspector
    National Board Commissioned Inspector

Used in Features of Work