DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Structural · Compliance Report

Blast Resistant Door

Blast Resistant Door used in energetics production and support facilities.

Most Restrictive Requirement
EN 1990
Basis of Structural Design

Required Certifications

  • UFC 3-340-02 Blast Test
  • ASTM F2927 Rating
  • GSA Blast Certification

Typically Missing at Submittal

  • ASTM F2927 Rating
  • DoD RMF ATO

Known Issues

  • Static dissipative materials not validated for energetic dust
  • IEC terminal identification differs from NEC color code

Required Standards (4)

Approval Authorities

  • AHJ
    Authority Having Jurisdiction
  • Cybersecurity Authority (ISSM)
    RMF Authorizing Official

Used in Features of Work