DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Process · Compliance Report

Vertical Planetary Mixer

Vertical Planetary Mixer used in energetics production and support facilities.

Most Restrictive Requirement
UFGS 40 05 13
Process Piping

Required Certifications

  • UL 698
  • ASME U-Stamp
  • NRTL Listing

Typically Missing at Submittal

  • NRTL Listing
  • UL 508A

Known Issues

  • IEC terminal identification differs from NEC color code
  • CE-marked vessel lacks ASME U-stamp

Required Standards (3)

Approval Authorities

  • USACE
    Construction Agent / Design Review
  • Fire Protection Engineer
    Qualified Fire Protection Engineer
  • Pressure Equipment Inspector
    National Board Commissioned Inspector

Used in Features of Work