  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Controls · Compliance Report

PLC Cabinet

PLC Cabinet used in energetics production and support facilities.

Most Restrictive Requirement
UFGS 25 05 11
Cybersecurity for Facility-Related Control Systems

Required Certifications

  • UL 508A
  • IEC 61511 SIL Certificate
  • DoD RMF ATO

Typically Missing at Submittal

  • IEC 61511 SIL Certificate
  • DoD RMF ATO

Known Issues

  • Static dissipative materials not validated for energetic dust
  • IEC terminal identification differs from NEC color code

Required Standards (5)