Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Pressure Equipment · Compliance Report

Rupture Disc

Rupture Disc used in energetics production and support facilities.

Most Restrictive Requirement
ASME PCC-2
Repair of Pressure Equipment and Piping

Required Certifications

  • ASME U-Stamp
  • National Board Registration
  • CE / PED Module

Typically Missing at Submittal

  • ASME U-Stamp
  • FM Approval

Known Issues

  • No RMF cybersecurity package for embedded controller
  • ATEX Zone marking not accepted as NEC Class/Division without NRTL evaluation

Required Standards (2)

  • ASMEASME PCC-2Repair of Pressure Equipment and Piping
  • PEDEN 764-7Safety Systems for Unfired Pressure Equipment