DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Structural · Compliance Report

Blast Resistant Window

Blast Resistant Window used in energetics production and support facilities.

Most Restrictive Requirement
UFC 3-340-02
Structures to Resist the Effects of Accidental Explosions

Required Certifications

  • UFC 3-340-02 Blast Test
  • ASTM F2927 Rating
  • GSA Blast Certification

Typically Missing at Submittal

  • GSA Blast Certification
  • NRTL Listing

Known Issues

  • Missing FM approval for explosion vent
  • Static dissipative materials not validated for energetic dust

Required Standards (5)

Approval Authorities

  • USACE
    Construction Agent / Design Review
  • Fire Protection Engineer
    Qualified Fire Protection Engineer
  • Pressure Equipment Inspector
    National Board Commissioned Inspector

Used in Features of Work