DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Pressure Equipment · Compliance Report

Pressure Vessel

Pressure Vessel used in energetics production and support facilities.

Most Restrictive Requirement
ASME PCC-2
Repair of Pressure Equipment and Piping

Required Certifications

  • ASME U-Stamp
  • National Board Registration
  • CE / PED Module

Typically Missing at Submittal

  • ASME U-Stamp
  • DoD RMF ATO

Known Issues

  • Metric conduit threads incompatible with NPT fittings
  • Blast loading not evaluated per UFC 3-340-02

Required Standards (2)

  • ASMEASME PCC-2Repair of Pressure Equipment and Piping
  • PEDEN 764-7Safety Systems for Unfired Pressure Equipment