Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Mechanical · Compliance Report

Process Chiller

Process Chiller used in energetics production and support facilities.

Most Restrictive Requirement
ASME B31.1
Power Piping

Required Certifications

  • AHRI Certified
  • UL Listed
  • ASME Stamp

Typically Missing at Submittal

  • ASME Stamp
  • DoD RMF ATO

Known Issues

  • Supplier not verified for Buy American compliance
  • 230/400V supply incompatible with 480V facility distribution

Required Standards (2)

Approval Authorities

  • USACE
    Construction Agent / Design Review
  • Fire Protection Engineer
    Qualified Fire Protection Engineer
  • Pressure Equipment Inspector
    National Board Commissioned Inspector

Used in Features of Work