DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Mechanical · Compliance Report

Hot Water Heater System

Hot Water Heater System used in energetics production and support facilities.

Most Restrictive Requirement
UFGS 23 35 19
Industrial Ventilation and Exhaust

Required Certifications

  • AHRI Certified
  • UL Listed
  • ASME Stamp

Typically Missing at Submittal

  • UL Listed
  • UL 508A

Known Issues

  • 230/400V supply incompatible with 480V facility distribution
  • Vendor documentation provided in German only

Required Standards (4)

Approval Authorities

  • AHJ
    Authority Having Jurisdiction
  • Cybersecurity Authority (ISSM)
    RMF Authorizing Official

Used in Features of Work