DECMS
  1. ✓Find scope
  2. ✓Governing rule
  3. ✓Resolve conflicts
  4. 4Verify equipment

Step 4: Verify equipment & export. Confirm required certifications before procurement and export the compliance report.

Full guide
← Equipment
Electrical · Compliance Report

Motor Control Center

Motor Control Center used in energetics production and support facilities.

Most Restrictive Requirement
UFC 3-575-01
Lightning and Static Electricity Protection Systems

Required Certifications

  • UL Listed
  • NRTL Class/Div Marking
  • IEEE Test Report

Typically Missing at Submittal

  • UL Listed
  • DoD RMF ATO

Known Issues

  • Metric conduit threads incompatible with NPT fittings
  • Blast loading not evaluated per UFC 3-340-02

Required Standards (6)

Approval Authorities

  • Electrical Safety Authority
    Electrical AHJ
  • Contracting Officer
    Procurement Authority

Used in Features of Work